What is the most efficient way to build fire lanes and pop stumps for new plots in a fresh clear cut. The logging crew used a 550 dozer to build landings, but I have about 9/10's of a mile of lane I want to put in and one more long linear plot. I don't want a trash job but it doesn't have to grade, I can do that with my tractor. Should I look for a track hoe operator or big dozer?