Although I'm over here in Mississippi at an unnamed power plant inspecting and sketching up repairs for stuff, my crack framing team is moving right along and texting me updates... The first floor is framed! Woot!

Mrs. Irish and I stopped by Dixie Salvage in Ft. Payne yesterday and bought 5 fiberglass and glass exterior doors and 38-4x8 sheets of T-111 5/8" reverse B&B siding for the 2nd floor sub-floor and the roof decking. The pretty side will go face down and will become the ceiling of the floors below.