Originally Posted By: rootstick
also, to be approved to be on the Verizon network a very specific questionnaire, which takes an electrical and mechanical engineer 6 months to answer, has to be submitted. At that time, it takes 6 months to 3 years to be approved. Also, this network is extremely picky on the equipment it allows on its system. If the majority is Chinese made, you don't have a chance. Elk, who makes your stuff?


Dang Root, you were so right! rofl


Alabama Hog Control, Inc.
www.alabamahogcontrol.com
Barry Estes

The only thing necessary for the triumph of evil is for good men to do nothing. Edmund Burke