|
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
30
|
31
|
|
|
128 registered members (Powers, Young20, gobbler, Solothurn, AJones, Reptar, Birdfeathers, The Big Cheese, M48scout, odocoileus, coldtrail, Chaser357, Jdkprp70, crenshawco, AUHoss79, Buckwheat, desertdog, MAG, marlin78, Backwater, Rip Wheeler, hallb, beeline08, Sully, dirtwrk, gobblebox, jdhunter2011, okfuski, JLMiller, Rolloverdave, Livintohunt19, Alb, Showout, Chiller, Stoney, Jweeks, fur_n_feathers, Mdees, hunter84, Team_Stuckem, JCL, BhamFred, limabean, Brian_C, brushwhacker, centralala, Tree Dweller, brianr, CrappieMan, Mbrock, CeeHawk37, TurkeyJoe, mathews prostaff, zgobbler5, Davyalabama, outdoorguy88, BigBuck10, buzzard, Turkeyhunter12, Paint Rock 00, sj22, Coosa1, CarbonClimber1, Remington270, Bows4evr, Bandit635, bug54, BamaPlowboy, jlbuc10, wareagul, BCLC, Turberville, Ridgehunter36, AU7MM08, Bustinbeards, kaferhaus, Holcomb, PikeRoadHunter, twaldrop4, 300gr, effinacotton, Heath, CNC, trailertrash, slanddeerhunter, 2 ducks, BPI, J_K, Fishduck, XVIII, mdavis, Jstocks, MikeP, Gobble4me757, Gunner211, thayerp81, WhoMe, GomerPyle, TWS1215, Shotts, icducks, TCG5, Swamp Dog, Whitetaillane, KEITH, BC, Obsession, Dixiepatriot, timberwolfe, dagwood, graydw1, Ron A., Brownitsdown, bfoote, Thread Killer, Shmoe, 12 invisible),
978
guests, and 0
spiders. |
Key:
Admin,
Global Mod,
Mod
|
|
|
Re: Needed - Engineered septic designer
[Re: jmudler]
#4084541
02/15/24 05:19 PM
02/15/24 05:19 PM
|
Joined: Nov 2011
Posts: 1,974 Alabama
bama_earl
8 point
|
8 point
Joined: Nov 2011
Posts: 1,974
Alabama
|
Earl is the best $hit stirrer on here. What exactly are you needing, like a CAD drawing or you just want me to sketch something out for you? Holla at your boy. :-)
|
|
|
Re: Needed - Engineered septic designer
[Re: CatHeadBiscuit]
#4084684
02/15/24 08:18 PM
02/15/24 08:18 PM
|
Joined: Jun 2014
Posts: 6,915 Shelby Co, AL
CatHeadBiscuit
OP
14 point
|
OP
14 point
Joined: Jun 2014
Posts: 6,915
Shelby Co, AL
|
We are still working waiting on the results from the county health department. The test holes keep filing up with water every time it rains. So it’s looking like the clay isn’t going to Perc and we’ll need a mound system. I’ve read a little about the aerobic systems but not enough yet. Just getting a plan together for when we get the test results and start sourcing a plan and materials.
Last edited by CatHeadBiscuit; 02/15/24 08:21 PM.
"Arguing on the internet is like playing chess with a pigeon. You may be good at chess, but the pigeon is just going to knock all the pieces down, take a crap on the table, and strut around like its victorious."--Anonymous
|
|
|
Re: Needed - Engineered septic designer
[Re: CatHeadBiscuit]
#4084705
02/15/24 08:43 PM
02/15/24 08:43 PM
|
Joined: Aug 2002
Posts: 5,767 Lower AL
k bush
12 point
|
12 point
Joined: Aug 2002
Posts: 5,767
Lower AL
|
We are still working waiting on the results from the county health department. The test holes keep filing up with water every time it rains. So it’s looking like the clay isn’t going to Perc and we’ll need a mound system. I’ve read a little about the aerobic systems but not enough yet. Just getting a plan together for when we get the test results and start sourcing a plan and materials. Secondary (aerobic) treatment will reduce the separation distance from the restriction layer, therefore a smaller footprint and fewer loads of dirt. If they’re calling for specific graded sand they may have designed a true Wisconsin Mound or a sand filter. There are a lot of options depending on your site limitations or your engineer’s preferences. Don’t hesitate to ask questions at your local Health Department.
"Cull" is just another four letter word...
|
|
|
|