I had a 1” meter installed for right around 6k. The line had to be bored under the road and the water provider is Montgomery county. I’m running 2” up to about 900’ for now. End run should be around 1,500’. I was quoted $4-10$ per foot of pipe by some contractors. I’m running my own, so it won’t be near that much. The rolls of pex that large are called by a different name and are much more $ than PVC. I priced 2” PVC at 4$ a foot.


It be's that way sometimes.

www.sunpoolcompany.com