Finally ended up finishing yesterday. Had to take the lift back to United Rentals in Rome, Ga. Shout out to those guys. I was able to get the lift on Monday at lunch and didn't return it until 1600 their time and was only charged for one day. Great folks to deal with.

I over estimated on my corrugated tin and ended up on the total job with about 9 pieces of 12' and 4 pieces of 8' left over. Just loaded them back up on the truck and returned them to Lowe's no questions asked. The Lowe's in Ft. Payne is a good Lowe's. They are always helpful there. Great service.

So here's the finished pics of the outside. I'm tempted to spray some vinegar or something on it to oxidize it a little and take the shine off. I want it to start looking weathered.

Still trying to figure out what I want to do to the bare concrete block foundation.