Originally Posted by kpswihart
Yes. Seems to be the way a lot of them are done now and should give a higher sheer strength than attaching posts to the slab directly.
Interesting, I have seen them put posts in and plumbing then pour slab then install roof and walls, always thought they did that due to easier access. Guess the slab stays cleaner pouring after building built.


"It is the mark of an educated mind to be able to entertain a thought without accepting it"