I wonder if the plan is to lift that middle one just enough to repair the track and ease forward with the engines until off the trestle. That avoids actually lifting a 200 ton locomotive. Afterwards, permanent repairs are made to the trestle.


Get the F out of the BATFE. The F is guaranteed by the US Constitution. Those other letters are not.

https://www.youtube.com/channel/UCP92wiGadrA0VOm72gbOllQ

NRA Life Member