|
S |
M |
T |
W |
T |
F |
S |
|
|
|
1
|
2
|
3
|
4
|
5
|
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
|
20
|
21
|
22
|
23
|
24
|
25
|
26
|
|
27
|
28
|
29
|
30
|
|
|
|
|
|
74 members (TamaDrumhead, BearBranch, BAR1225, James, 1hunter, fish251, CNC, paintrock, odocoileus, remlap, RSF, donia, leroyb, Joe4majors, TexasHuntress, 3bailey3, Luvbowhuntn, Josh Crocker, AUdeer88, Fullthrottle, Tigger85, Captain Howdy, bamapanic, M48scout, roosterbob, woodduck, slipperyrock, BrandonClark, Dog, therealhojo, Morris, AU7MM08, HIPCEO, doublefistful, ucmducks, 4Tigers, Stacey, Bamarich2, Butchman205, JohnG, Longtine, Claims Rep., Beadlescomb, BAR II .270, cullbuck, Okatuppa, Cynical, ozarktroutbum, deadeye48, TDog93, Double Creek2, skymech, AU338MAG, AlabamaPhi, burbank, NorthFork, UA Hunter, RidgeRanger, rst87, Young20, Showout, RLP76, jarcher38, trlrdrdave, RCHRR, 9 invisible),
902
guests, and
0
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Feb 2002
Posts: 46,081 Likes: 240
Freak of Nature
|
|
Freak of Nature
Joined: Feb 2002
Posts: 46,081 Likes: 240 |
I wonder if the plan is to lift that middle one just enough to repair the track and ease forward with the engines until off the trestle. That avoids actually lifting a 200 ton locomotive. Afterwards, permanent repairs are made to the trestle.
|
|
|
|
|