Originally Posted by Skinny
You could if its not to far, I do not know the costs or how it fits together but ask. Can you just pump hose the concrete you need over from the truck? I've seen them pump concrete a pretty long distance at different job sites.

I think it's probably too far l. Atleast 100-125 yards horizontal and about 20-25 in elevation from the closet point across the pond to build site.


"Never met a deer that I didn't like" - QDMAV8R