You dont need to worry Slippin'. You'll be long dead and gone by the time that happens. If it's like the 158 bypass from Saraland to the MS line, it'll take 25 years for them to make it up to I10 and then another 50 yrs before they finish connecting from 10 to 65. State of AL is beyond slow when it comes to road construction projects and environmental groups will be challenging every step of the process, from the design phase and every single time during clearing and construction when they get close to a wetland, crossing every creek, ditch, gum pond, or swamp head along the way.