Originally Posted by AU338MAG
Originally Posted by just_an_illusion
I poured 4 yards of 3000 psi with fiber yesterday. Break down on the ticket was:

$170 yard for the mud
$10 yard for the fiber
$40 fuel surcharge
$75 minimum load charge
+ Tax

I think the total was $887.25

Who did you pay $170/CY for 3000 PSI concrete? We're paying about $130/CY for 3000


The only game in town that will deliver a half load to Grant, Kirkpatrick Concrete in Guntersville.