Originally Posted by dsmc
You need double wall going from the stove to a ceiling box, then triple wall out the roof to about 2’-3’ above the ridge line.
That should take care of any draft issues. If the pipe is 10” diameter coming from the stove it may be already be double wall.
You have to use the size pipe the the stove uses, either 6” or 8”. My Buck stove uses 8” but it’s a large stove.


Why double wall inside?