134 members (centralala, JAT, !shiloh!, smithgrow, cullbuck, outdoorguy88, bamafarmer, RidgeRanger, DoeNut, cch, rhino21, CNC, cartervj, dtmwtp, Big AL 76, Bandit635, Wes7777, Captain Howdy, NotsoBright, Robert D., NorthFork, Pwyse, AU7MM08, billrv, Fishbones, bamaeyedoc, claybird, YellaLineHunter, Cjunkin, C3SEAST, Birdman83, WhoMe, Cynical, deadeye48, sawdust, sj22, Narrow Gap, Remington270, JHL, 10 POINT, stuball, LDTiger, 7short, CAL, Raincrow, BobK, GomerPyle, ALDawg, Skinner, Dean, Mack1, bows_and_does, Geeb, Marengo hunter, weatherby, PYhunter, dave260rem!, Solothurn, staticflownut, Turkeyneck78, inatree, Sasquatch Lives, WGDfarm23, auman, k bush, Yellerhammer, jacannon, 3blades, ferbama, BentBarrel, Fattyfireplug, SC53, Bowfish, booner, gog1015, mathews prostaff, Ben2, geeb1, paulfish4570, deerman24, BOFF, mjs14, dagwood, Dr595, Josh Crocker, desertdog, woodduck, jjust, Showout, jdstephen44, Atoler, quailman, shootnmiss, janiemae, 300gr, Longtine, jhardy, M48scout, Keysbowman, Gut Pile 32, South Ala Hunter, chill, AWT6, Crawfish, MPbow_man, mossyback, 3bailey3, dustymac, coldtrail, Six shooter, jmj120, HawkPilot, Calvin, jarcher38, DGAMBLER, abolt300, AJones, CatHeadBiscuit, curt99rsv, bug54, Jstocks, Wyatt lance, 12 invisible),
784
guests, and
0
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Dec 2011
Posts: 403
4 point
|
|
4 point
Joined: Dec 2011
Posts: 403 |
What would be a rough cost per sq foot to construct a metal building? Any contacts for central Alabama would be helpful if you didn’t mind sharing. Thank you
|
|
|
|
|
Joined: Dec 2009
Posts: 9,375
14 point
|
|
14 point
Joined: Dec 2009
Posts: 9,375 |
Not sure if this helps but I just priced a concrete pad for a new warehouse (50x100, 8” pour) and it’s gonna be close to $50k. That includes some pretty deep footers though and 1 6x6x6’ footer for a jib hoist.
I haven’t priced the building yet though. I’m thinking it would be better to buy the building kit from the manufacture and contract out the labor to erect.
|
|
|
|
|
Joined: Dec 2011
Posts: 403
4 point
|
|
4 point
Joined: Dec 2011
Posts: 403 |
|
|
|
|
|
Joined: Nov 2011
Posts: 22,608 Likes: 22
Freak of Nature
|
|
Freak of Nature
Joined: Nov 2011
Posts: 22,608 Likes: 22 |
The bigger you go the less it will be per sq ft. A 30x30 will be a lot more per foot than a 40x60
|
|
|
|
|
Joined: Dec 2014
Posts: 1,598
8 point
|
|
8 point
Joined: Dec 2014
Posts: 1,598 |
First, off are you talking tube steel or red iron? Big difference in cost and you need to determine your need. Mine was just for a shop and tube steel was just fine. A 24x36 with two ten foot doors and a single walk door cost me $7500 in 2016. It was built on a slab that cost me $3500.
I just priced the same thing again on Max Steel Buildings and the price is $13,470. And I know concrete has gone up. Hope that helps some
|
|
|
|
|
Joined: Dec 2011
Posts: 403
4 point
|
|
4 point
Joined: Dec 2011
Posts: 403 |
Yes doe nut, it helps tremendously
|
|
|
|
|
Joined: Oct 2012
Posts: 12,138 Likes: 41
Booner
|
|
Booner
Joined: Oct 2012
Posts: 12,138 Likes: 41 |
I just put deposit on a 26x20 with a 12’x26’ lean-to, 12’ walls, fully insulated with a 10’x10’ roll up, man door and window @13k tax, delivered and constructed. By my estimate I’ll be at about 22$ Sq/ft with concrete.
Well, the way I see it is there's just too many assholes On a good day there's a bunch of assholes in here. On a bad day there's too many assholes in here.
|
|
|
|
|
Joined: Oct 2012
Posts: 1,815
8 point
|
|
8 point
Joined: Oct 2012
Posts: 1,815 |
160x80 with 6 in slab. 2 12ft wide roll up motorized doors. 2 walk-in doors 14 tall at the sides $194000.00
Last edited by PaintRock0; 03/20/21 07:41 PM.
|
|
|
|
|
Joined: Sep 2014
Posts: 1,766 Likes: 8
8 point
|
|
8 point
Joined: Sep 2014
Posts: 1,766 Likes: 8 |
|
|
|
|
|
Joined: Nov 2005
Posts: 4,500 Likes: 14
10 point
|
|
10 point
Joined: Nov 2005
Posts: 4,500 Likes: 14 |
I was ready to pull the trigger on a red iron building about a year and a half ago but couldn’t find anyone to erect it that wasn’t backlogged a year and a half or so ago.
Just make sure you have someone that can erect it before you buy it.
Tube steel isn’t a problem getting assembled but red iron is a totally different story.
You're only as good as your worst shot-
|
|
|
|
|
Joined: Sep 2013
Posts: 1,405
8 point
|
|
8 point
Joined: Sep 2013
Posts: 1,405 |
|
|
|
|
|
Joined: Jan 2020
Posts: 799 Likes: 11
4 point
|
|
4 point
Joined: Jan 2020
Posts: 799 Likes: 11 |
Bustinbeards, who are you getting that building through? I am looking to build something very similar to that same spec.