I was the Project Supt. over 3 Condo Builds over a 5 year period in Destin and PCB back in '04 to '09......The quality of the finishes was PITIFUL....BUT..We were fighting a Un-Achieveable Schedule....which was linked to the $$$$$$$$$$$$$$$$$$$$....Along with a lot of poor help.