[/quote]
What you say?[/quote]
The OP said " I need to make fire lane roads, clear some 20 year old regrowth, build a pond, and make a long gravel driveway. " Now you bring your 257 skid steer and I'll bring my D6N or 953C and we each bring $1,000 for every hour the other is still working after the first one finishes. I won't even charge the OP. The floor is open for side bets too.

[/quote]
What are you going to pay for that D6? What are you going to pay for that 953C? What you gonna need to transport that equipment? Y'all are laughable sometimes. A D6will out perform a skid steer by a small margin because of its sheer size. And you'll need the extra side bet money to pay the guy that picks up the leftover limbs and roots up that you leave behind. I'll bring a 289 and tin circles around that D6.


It be's that way sometimes.

www.sunpoolcompany.com