Originally Posted By: whack-n-stack
How did you make the joint at the metal -> wood siding.


The cedar shakes go up to a 1x6 continuous piece of cedar trim, then I installed a 2x2 piece of galvanized drip rail on top of that, then I installed the corrugated tin over the top of that.

Last edited by Irishguy; 10/06/17 12:57 AM.

"When I say ever thing I mean ever thing." - Frankie