S |
M |
T |
W |
T |
F |
S |
|
|
|
|
|
|
|
1
|
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
|
30
|
31
|
|
|
|
|
|
|
|
13 members (coosabuckhunter, UA Hunter, gregnbc, catdoctor, Exhoosier, Stacey, dustymac, JD53, BrandonClark, odocoileus, Thread Killer, fish251, 1 invisible),
716
guests, and
0
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Jan 2014
Posts: 680
4 point
|
|
4 point
Joined: Jan 2014
Posts: 680 |
I am looking at building a home in the near future. This will be my first build so it will all be a new process. I know costs are significantly higher than a few years ago but am in a position where this will be my best option going forward. I am wanting a rough estimate as to what my cost for complete build will be from those with experience. Note I am located in Baldwin County.
2000 sq foot living Farmhouse style preferably but this is debatable 3 bed/2 bath Walk in closets Walk in pantry Decent sized front porch for sitting Big enough back porch to fit a few grills, tv, patio furniture 2 car carport with storage area for lawn equipment, tools, etc Will need septic tank Will need driveway install approximately 200 yards preferably crushed asphalt
For the home builders and those with experience shoot me an estimate as to what yall think I am looking at paying? Also what is the average cost per sq foot these days?
“Are you gonna pull them pistols or whistle Dixie”. - Josey Wales
|
|
|
|
|
Joined: Nov 2011
Posts: 22,603 Likes: 22
Freak of Nature
|
|
Freak of Nature
Joined: Nov 2011
Posts: 22,603 Likes: 22 |
I can't imagine a new home build being much under $200/ft these days. Especially with the big porches that you're talking bout. That adds to the under-roof space, but not to the heated/cooled square footage. Best of luck with the build! 
|
|
|
|
|
Joined: Jul 2011
Posts: 39,938 Likes: 130
Freak of Nature
|
|
Freak of Nature
Joined: Jul 2011
Posts: 39,938 Likes: 130 |
Will it have site finished hardwood , working fire place, lot of tile work, solid surface counter tops , custom cabinetry ? How will the outside be finished ? Are you going to hire / contract all the work to be done by others?
"Why do you ask"?
Too many people spend money they don't have , on things they don't need, to impress people they don't know.
|
|
|
|
|
Joined: Sep 2012
Posts: 24,103 Likes: 296
Freak of Nature
|
|
Freak of Nature
Joined: Sep 2012
Posts: 24,103 Likes: 296 |
I can't imagine a new home build being much under $200/ft these days. Especially with the big porches that you're talking bout. That adds to the under-roof space, but not to the heated/cooled square footage. Best of luck with the build!  $200/sf MINIMUM.
Dying ain't much of a living boy...Josey Wales
Molon Labe
|
|
|
|
|
Joined: Jan 2014
Posts: 680
4 point
|
|
4 point
Joined: Jan 2014
Posts: 680 |
Will it have site finished hardwood , working fire place, lot of tile work, solid surface counter tops , custom cabinetry ? How will the outside be finished ? Are you going to hire / contract all the work to be done by others? Vinyl wood flooring, no fire place, tile in kitchen/bathrooms, solid surface countertops, no custom cabinets. Board and batten siding. The work will be done through a custom home builder.
“Are you gonna pull them pistols or whistle Dixie”. - Josey Wales
|
|
|
|
|
Joined: Jul 2011
Posts: 39,938 Likes: 130
Freak of Nature
|
|
Freak of Nature
Joined: Jul 2011
Posts: 39,938 Likes: 130 |
$200 +/- $10 SF , not counting that long driveway .
"Why do you ask"?
Too many people spend money they don't have , on things they don't need, to impress people they don't know.
|
|
|
|
|
Joined: Mar 2011
Posts: 799 Likes: 1
4 point
|
|
4 point
Joined: Mar 2011
Posts: 799 Likes: 1 |
Not sure of the market down there but assuming this is on a slab we built custom higher end finishes 3 years ago in the bham area for less than $160/sf so it is possible. Get a few builders to give you an estimate. Just know you will end up over budget regardless.
|
|
|
|
|
Joined: Sep 2014
Posts: 8,551 Likes: 5
14 point
|
|
14 point
Joined: Sep 2014
Posts: 8,551 Likes: 5 |
I’m almost 4yrs into the land I bought to build on. I haven’t even pushed the first bit of dirt yet. If things don’t change it’s possible that I won’t. We have about 3 plans we’ll have to narrow down to 1, but either way from everything I’m hearing from people it’s going to be $185-$200 sqft. Interest rates haven’t changed much either. Good luck to you I hope you find somebody that can build your house at a reasonable rate.
|
|
|
|
|
Joined: Dec 2004
Posts: 20,179 Likes: 81
Freak of Nature
|
|
Freak of Nature
Joined: Dec 2004
Posts: 20,179 Likes: 81 |
Will you need to clear a spot too or is it already cleared? A buddy of mine built a home that had a semi cleared spot and the prep work to cut a driveway in, finish clearing, leveling, and getting it ready to build was nearly $20k before they even started. Your going to be at a minimum of $200.00 sqft
If voting made any difference, they wouldn’t let us do it.-Mark Twain
|
|
|
|
|
Joined: Nov 2011
Posts: 22,603 Likes: 22
Freak of Nature
|
|
Freak of Nature
Joined: Nov 2011
Posts: 22,603 Likes: 22 |
This seems obvious, but I'll say it anyway. If you buy an existing house, the land is included in the price. If you build, the land isn't. So it's never an apples to apples comparison. It seems that buying an existing house is always cheaper and less headache. I've had many old men tell me to never build, and I've listened 
|
|
|
|
|
Joined: Feb 2011
Posts: 780
4 point
|
|
4 point
Joined: Feb 2011
Posts: 780 |
The bigger the porches and garage, the more the living area dollar per sq/ft also goes up. To answer your question, lock and key around my neck of the woods I would guess your looking at around $400-$450k price excluding land cost and site prep not being too big of an issue. Contractor is gonna make 80-100k of that, so anything you can do yourself will save you that much and maybe more. Too many variables to nail down exact costs.
|
|
|
|
|
Joined: Jul 2021
Posts: 5,897 Likes: 43
12 point
|
|
12 point
Joined: Jul 2021
Posts: 5,897 Likes: 43 |
Make sure plans have a storm shelter or a safe room? Hopefully never need it.
|
|
|
|
|
Joined: Jan 2014
Posts: 680
4 point
|
|
4 point
Joined: Jan 2014
Posts: 680 |
Will you need to clear a spot too or is it already cleared? A buddy of mine built a home that had a semi cleared spot and the prep work to cut a driveway in, finish clearing, leveling, and getting it ready to build was nearly $20k before they even started. Your going to be at a minimum of $200.00 sqft Land is inherited and is flat open field so money is being saved there.
“Are you gonna pull them pistols or whistle Dixie”. - Josey Wales
|
|
|
|
|
Joined: Oct 2006
Posts: 9,133 Likes: 40
14 point
|
|
14 point
Joined: Oct 2006
Posts: 9,133 Likes: 40 |
The answer is - whatever you are planning for, add about 25 - 50% for change orders. I can pretty much guarantee you that you and or your wife will want additional electrical outlets, data connections, higher end appliances, AC + duct work, changes to the doors and handles, counter tops...etc (you should get the picture). It is ridiculous what it costs to build a house. Believe it or not - electrical will eat you alive.
Building: Builder's grade $180+ sf (stick to the plan - laminated counter tops, DO NOT add/move electrical (standard 200Amp electrical service), finished drywall, standard molding, hollow doors, standard cabinets, LVL flooring. Custom $250+ sf - custom cabinets, all of the outlets you will want, good paint job, solid doors, insulation on the inside walls to reduce noise,..etc.
Just went through it 3-years ago - our change orders were close to 30% and we planned on a lot of custom work.
"The struggle you're in today, is developing the strength you need for tomorrow."
|
|
|
|
|
Joined: Jan 2014
Posts: 10,586 Likes: 2
Lucky Bastage
|
|
Lucky Bastage
Joined: Jan 2014
Posts: 10,586 Likes: 2 |
I’m still in the same ole House I bought way back when houses were considered cheap in 2009-2010… but the houses I see now, for sale, that I like, are starting in the 700k range. One I really Like is sitting at 799k right now 😬
Wife keeps sending me random listings that she likes.. I’m trying to buy as much time as I can.
The fool tells me his reasons; the wise man persuades me with my own.
|
|
|
|
|
Joined: Mar 2011
Posts: 1,555 Likes: 31
8 point
|
|
8 point
Joined: Mar 2011
Posts: 1,555 Likes: 31 |
Please PM me your home plans, I’m interested in giving you an itemized quote. Thanks !
|
|
|
|
|
Joined: Mar 2013
Posts: 15,167 Likes: 7
Old Mossy Horns
|
|
Old Mossy Horns
Joined: Mar 2013
Posts: 15,167 Likes: 7 |
If you have a regular box house no crazy pitched roof and dont go extravagant on the inside you can build for $160 sqft around here right now according to a builder I talk to. Now where I work try $245 plus a sqft.
Would walk over a naked woman to get to a gobblin turkey!
|
|
|
|
|
Joined: Jan 2017
Posts: 10,381 Likes: 150
Glad He Doesn’t Have One
|
|
Glad He Doesn’t Have One
Joined: Jan 2017
Posts: 10,381 Likes: 150 |
There’s a builder down here claiming she builds them for 125 a sq ft.
|
|
|
|
|
Joined: Mar 2013
Posts: 15,167 Likes: 7
Old Mossy Horns
|
|
Old Mossy Horns
Joined: Mar 2013
Posts: 15,167 Likes: 7 |
The answer is - whatever you are planning for, add about 25 - 50% for change orders. I can pretty much guarantee you that you and or your wife will want additional electrical outlets, data connections, higher end appliances, AC + duct work, changes to the doors and handles, counter tops...etc (you should get the picture). It is ridiculous what it costs to build a house. Believe it or not - electrical will eat you alive.
Building: Builder's grade $180+ sf (stick to the plan - laminated counter tops, DO NOT add/move electrical (standard 200Amp electrical service), finished drywall, standard molding, hollow doors, standard cabinets, LVL flooring. Custom $250+ sf - custom cabinets, all of the outlets you will want, good paint job, solid doors, insulation on the inside walls to reduce noise,..etc.
Just went through it 3-years ago - our change orders were close to 30% and we planned on a lot of custom work. If they aren’t in the shitty soil like 85 south you can build wayy cheaper. I’m talking custom home builds. Ask leroycn
Would walk over a naked woman to get to a gobblin turkey!
|
|
|
|
|
Joined: Jun 2020
Posts: 4,976 Likes: 39
12 point
|
|
12 point
Joined: Jun 2020
Posts: 4,976 Likes: 39 |
We went to a builder supply type store and got a quote on our plans, I drew up myself. Doubled that and that's really close to closing costs. Already owned the land.
Love a good hunting story, love my family and friends. Some people you can't, but acted like do.
|
|
|
|
|