JR Holmes Oil Company </a </a Shark Guard REST NEST MATTRESS Mayer Insurance Services LLC
Serious Deer Talk
New SOAs?
by Beadlescomb - 08/25/26 10:50 PM
Cattle for deer habitat improvement
by desertdog - 08/25/26 10:48 PM
First fawn!
by ford150man - 08/24/26 06:58 PM
what deer see
by Frankie - 08/24/26 03:45 PM
Leafy suit ground hunting
by murf205 - 08/24/26 02:23 PM
LOGIN to view CLASSIFIEDS
Land, Leases, Hunting Clubs
Winston County club taking 2 members
by FreeStateHunter - 08/19/26 12:22 PM
NWA Hunt Club in Vernon/Sulligent area
by ScoutsOut - 08/18/26 07:54 AM
2 Spots Open Perry Co Club
by rja - 08/16/26 03:40 PM
Any clubs around Auburn looking for members
by Brady45 - 08/10/26 07:42 PM
Looking for a Club or Lease
by Turkeyhunter12 - 07/31/26 12:18 PM
August
S M T W T F S
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
Who's Online Now
36 members (kyles, MoeBuck, StateLine, MikeP, 000buck, Fbw93, cartervj, outdoorguy88, Narrow Gap, Skullworks, wareagle22, Obsession, PikeRoadHunter, AUjerbear, Josh3, MCW, BPI, Young20, 3Gs, 7mmSTW, mopar, Bama-66, fur_n_feathers, mjs14, janiemae, Fishminer91, gobblebox, gregnbc, catdoctor, coosabuckhunter, 6 invisible), 734 guests, and 0 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
#2781755 04/10/19 01:13 AM
Joined: Oct 2010
Posts: 4,757
D
10 point
10 point
D Offline
Joined: Oct 2010
Posts: 4,757
Been calling around on getting a shop built. Had a couple of guys ask if I want rebar or if I fiber in my concrete. I currently haven2 slabs on my place. One was poured with rebar closet to 50 yrs ago. The other is fiber about 10 yes. Ago. The old floor still looks good where the new one is cracked every where. What would y’all recommend fiber or bar? Looking at 40x80 4-8 thick

dnolen #2781758 04/10/19 02:21 AM
Joined: Oct 2014
Posts: 4,660
Likes: 26
K
10 point
10 point
K Offline
Joined: Oct 2014
Posts: 4,660
Likes: 26
I've poured two with fiber. No cracks yet, but the heaviest things I put in it are boats, and occasionally my truck.

dnolen #2781762 04/10/19 04:27 AM
Joined: Jan 2002
Posts: 10,488
Likes: 1
D
Booner
Booner
D Offline
Joined: Jan 2002
Posts: 10,488
Likes: 1
Neither one will prevent cracks; they provide strength and a shop shouldn’t need either if you don’t have any really heavy point loading. . There are two types of concrete; the kind that has cracked and the kind that going to crack. The only way to minimize cracks is proper curing. As concrete sets, it generates a lot of heat. Controlling the heat differential between the core of the concrete and the constantly changeing ambient temperature is the key. Most people don’t bother with driveways and slabs because the thickness isn’t much. But, if you will keep it wet with burlap or something similar over the first 12-24 hours it will help tremendously. You can also have the ready mix company add ice but that’s usually for really thick pours and a skilled finisher. Pouring at night helps as well. Just do a little research on curing temperatures. And, I'll add that proper control joints help with controlling cracking.
Here's a good pedestrian explanation on curing:
https://www.thebalancesmb.com/highly-recommended-methods-to-cure-concrete-844449

Last edited by Dallas County; 04/10/19 05:37 AM.

not sure what the best way to handle them is but they shouldnt be on tv and gettn married and raisin kids

dnolen #2781819 04/10/19 06:50 AM
Joined: Sep 2012
Posts: 24,103
Likes: 296
Freak of Nature
Freak of Nature
Joined: Sep 2012
Posts: 24,103
Likes: 296
To add to what Dallas said, you do not want your concrete to be self leveling as it is poured. This means there is too much water in the mix. This will create more curling and shrinkage as the concrete cures, which will cause more cracks.


Dying ain't much of a living boy...Josey Wales

Molon Labe
dnolen #2781861 04/10/19 07:46 AM
Joined: Aug 2018
Posts: 6,041
12 point
12 point
Joined: Aug 2018
Posts: 6,041
I'm sure there are engineers on this board that could give you all the info in concrete strength and reinforcement requirements.

Though I have been out of the business a while, we used 12 inch centers on 4 inch pours and 18 inch centers on 6 inch for our rebar spacing. Wire mesh works too but is a pain to use on smaller runs.

If it was my shop I would run wire mesh and then tie it together with #4 rebar. Then the 2nd day after the pour I would cut groves every 10 feet.

Overkill, maybe but I never had to go back and redo any of my jobs.

dnolen #2781880 04/10/19 08:14 AM
Joined: Nov 2015
Posts: 21,456
Freak of Nature
Freak of Nature
Joined: Nov 2015
Posts: 21,456
30 x 40 shop, did mesh and rebar.


Isaiah 5:20 Woe to those who call evil good and good evil, who put darkness for light and light for darkness, who put bitter for sweet and sweet for bitter.
Semo #2781942 04/10/19 09:44 AM
Joined: Apr 2016
Posts: 3,546
10 point
10 point
Joined: Apr 2016
Posts: 3,546
Originally Posted by Semo
I'm sure there are engineers on this board that could give you all the info in concrete strength and reinforcement requirements.

Though I have been out of the business a while, we used 12 inch centers on 4 inch pours and 18 inch centers on 6 inch for our rebar spacing. Wire mesh works too but is a pain to use on smaller runs.

If it was my shop I would run wire mesh and then tie it together with #4 rebar. Then the 2nd day after the pour I would cut groves every 10 feet.

Overkill, maybe but I never had to go back and redo any of my jobs.

I am one of those engineers. Like most things, rule of thumb, with experience to back it up, will cover most situations, and if you are pouring a shop slab of 4 or 8 inches, it's not critical. I would use mesh over the entire slab and rebar just around the edge of the entire slab and fiber for more tensile strength, but I'm cautious. It will crack, as was stated above, so you put in seams to control where it cracks. Foundations and slabs for more than a boat or car or tractor in a shop need to be designed for point or distributed loads, and if that's the case, you need a civil engineer to design it, but doesn't sound like what you have there.


"For the Truth the Turkey is in Comparison a much more respectable Bird, and withal a true original Native of America" ~Benjamin Franklin

Isaiah 40:13-14

RAP is CRAP

NRA Life Member, GOA, BamaCarry Member
Joined: Jan 2001
Posts: 29,718
Likes: 165
Freak of Nature
Freak of Nature
Joined: Jan 2001
Posts: 29,718
Likes: 165
Originally Posted by Dallas County
Neither one will prevent cracks; they provide strength and a shop shouldn’t need either if you don’t have any really heavy point loading. . There are two types of concrete; the kind that has cracked and the kind that going to crack. The only way to minimize cracks is proper curing. As concrete sets, it generates a lot of heat. Controlling the heat differential between the core of the concrete and the constantly changeing ambient temperature is the key. Most people don’t bother with driveways and slabs because the thickness isn’t much. But, if you will keep it wet with burlap or something similar over the first 12-24 hours it will help tremendously. You can also have the ready mix company add ice but that’s usually for really thick pours and a skilled finisher. Pouring at night helps as well. Just do a little research on curing temperatures. And, I'll add that proper control joints help with controlling cracking.
Here's a good pedestrian explanation on curing:
https://www.thebalancesmb.com/highly-recommended-methods-to-cure-concrete-844449


WOW Taylor, I just learned a lot. Good explanation and info that I may never need to know, but then again who knows. Truly, I didn't know any of that.


Lord, please help us get our nation straightened out.
dnolen #2781954 04/10/19 10:01 AM
Joined: Jan 2002
Posts: 10,488
Likes: 1
D
Booner
Booner
D Offline
Joined: Jan 2002
Posts: 10,488
Likes: 1
Jawbone, I'm on a red wine and concrete roll today smile Don't know too much about anything else though.


not sure what the best way to handle them is but they shouldnt be on tv and gettn married and raisin kids

soalaturkeys #2781965 04/10/19 10:16 AM
Joined: Mar 2017
Posts: 906
My head is in my ass.
My head is in my ass.
Joined: Mar 2017
Posts: 906
Originally Posted by soalaturkeys
Originally Posted by Semo
I'm sure there are engineers on this board that could give you all the info in concrete strength and reinforcement requirements.

Though I have been out of the business a while, we used 12 inch centers on 4 inch pours and 18 inch centers on 6 inch for our rebar spacing. Wire mesh works too but is a pain to use on smaller runs.

If it was my shop I would run wire mesh and then tie it together with #4 rebar. Then the 2nd day after the pour I would cut groves every 10 feet.

Overkill, maybe but I never had to go back and redo any of my jobs.

I am one of those engineers. Like most things, rule of thumb, with experience to back it up, will cover most situations, and if you are pouring a shop slab of 4 or 8 inches, it's not critical. I would use mesh over the entire slab and rebar just around the edge of the entire slab and fiber for more tensile strength, but I'm cautious. It will crack, as was stated above, so you put in seams to control where it cracks. Foundations and slabs for more than a boat or car or tractor in a shop need to be designed for point or distributed loads, and if that's the case, you need a civil engineer to design it, but doesn't sound like what you have there.



I'm NOT an engineer, just a damned good red-neck fixer of things, AND I stay in a Holiday Inn Express once before and I can tell you this is exactly what I would do.

Joined: Jul 2005
Posts: 19,569
Likes: 23
Old Mossy Horns
Old Mossy Horns
Joined: Jul 2005
Posts: 19,569
Likes: 23
Originally Posted by Dallas County
Neither one will prevent cracks; they provide strength and a shop shouldn’t need either if you don’t have any really heavy point loading. . There are two types of concrete; the kind that has cracked and the kind that going to crack. The only way to minimize cracks is proper curing. As concrete sets, it generates a lot of heat. Controlling the heat differential between the core of the concrete and the constantly changeing ambient temperature is the key. Most people don’t bother with driveways and slabs because the thickness isn’t much. But, if you will keep it wet with burlap or something similar over the first 12-24 hours it will help tremendously. You can also have the ready mix company add ice but that’s usually for really thick pours and a skilled finisher. Pouring at night helps as well. Just do a little research on curing temperatures. And, I'll add that proper control joints help with controlling cracking.
Here's a good pedestrian explanation on curing:
https://www.thebalancesmb.com/highly-recommended-methods-to-cure-concrete-844449


Agree completely.
I'll further add that you can do everything by the textbook on the actual concrete mix, controlling temps and moisture, the wire/rebar/fiber placement, the forming, the pour, joints, and the finishing---and still have cracks because of other factors going on with the grade or site prep or water impacting the slab well after the pour or a host of other things.

Last edited by straycat; 04/10/19 04:24 PM.

"The grass withers, the flower fades, But the word of our God stands forever." Isaiah 40:8

"Neither the wisest constitution nor the wisest laws will secure the liberty and happiness of a people whose manners are universally corrupt.� Samuel Adams
dnolen #2782428 04/10/19 08:50 PM
Joined: Nov 2014
Posts: 2,369
8 point
8 point
Joined: Nov 2014
Posts: 2,369
I would use wire mesh sheets and fiber


Cat doctor

Link Copied to Clipboard
http://www.aldeer.com/" Aldeer.com Copyright 2001-2026 Aldeer LLP.
Powered by UBB.threads™ PHP Forum Software 8.0.0
(Release build 20240826)
Responsive Width:

PHP: 7.4.33 Page Time: 0.049s Queries: 38 (0.027s) Memory: 3.1022 MB (Peak: 3.5600 MB) Data Comp: Off Server Time: 2026-08-26 09:45:19 UTC
Valid HTML 5 and Valid CSS